All authorities › Chichester

Building Safety Levy in Chichester

Chichester is the 77th most expensive of 298 English collecting authorities. The greenfield area rate is £39.98/m², halved to £19.99/m² where ≥75% of the red-line boundary qualifies as previously developed land. BSL commences 1 October 2026 and is collected by Chichester at building-control and commencement stages.

Rates for Chichester

Rate type£ per m² GIAApplies when
Greenfield (standard)£39.98Less than 75% of site is previously developed land
Brownfield (PDL discount)£19.99≥75% of site is previously developed land (any building since July 1948, excluding agriculture)

Source: Schedule 3, Building Safety Levy (England) Regulations 2025, effective 1 October 2026.

Example scheme costs in Chichester

SchemeTotal chargeable GIA Greenfield levyBrownfield levyPDL saving
10 dwellings at 85 m² each (small infill)850 m²£33,983£16,992£16,992
50 dwellings at 100 m² each (typical phase)5,000 m²£199,900£99,950£99,950
100 dwellings at 95 m² each (mid-size scheme)9,500 m²£379,810£189,905£189,905
200 dwellings at 90 m² each (major development)18,000 m²£719,640£359,820£359,820

All examples assume 100% residential with no communal-area adjustments. Real schemes will differ based on communal floorspace, PBSA bedspaces, and exemptions.

The 50% brownfield discount

For a typical 50-dwelling scheme in Chichester, successfully evidencing previously developed land status saves £99,950 in levy. That’s the whole point of the PDL evidence workflow — the statutory definition (any building on the site since 1 July 1948, excluding agriculture) is broader than the local brownfield register, and most sites qualify in full or in part when historic OS maps and aerial imagery are reviewed.

Run your scheme through the calculator →

Related authorities

Similar rates or alphabetically adjacent:

West Berkshire £39.90Trafford £39.83Lewes £40.13East Hampshire £40.18Cheshire West and Chester £24.85Chesterfield £18.75Chorley £20.27City of London £87.04

Submitting your BSL information to Chichester

BSL submissions happen in two stages: (1) at your building-control application, and (2) at your first commencement notice. Chichester has five weeks from your commencement notice to assess and issue a liability notice. Any GIA or PDL discrepancy can delay commencement.

BSL Prep extracts chargeable GIA from your architectural PDFs, compiles the PDL evidence pack, and produces the submission proforma for Chichester in one click. See pricing →