Building Safety Levy in Reigate and Banstead
Reigate and Banstead is the 58th most expensive of 298 English collecting authorities. The greenfield area rate is £43.76/m², halved to £21.88/m² where ≥75% of the red-line boundary qualifies as previously developed land. BSL commences 1 October 2026 and is collected by Reigate and Banstead at building-control and commencement stages.
Rates for Reigate and Banstead
| Rate type | £ per m² GIA | Applies when |
|---|---|---|
| Greenfield (standard) | £43.76 | Less than 75% of site is previously developed land |
| Brownfield (PDL discount) | £21.88 | ≥75% of site is previously developed land (any building since July 1948, excluding agriculture) |
Source: Schedule 3, Building Safety Levy (England) Regulations 2025, effective 1 October 2026.
Example scheme costs in Reigate and Banstead
| Scheme | Total chargeable GIA | Greenfield levy | Brownfield levy | PDL saving |
|---|---|---|---|---|
| 10 dwellings at 85 m² each (small infill) | 850 m² | £37,196 | £18,598 | £18,598 |
| 50 dwellings at 100 m² each (typical phase) | 5,000 m² | £218,800 | £109,400 | £109,400 |
| 100 dwellings at 95 m² each (mid-size scheme) | 9,500 m² | £415,720 | £207,860 | £207,860 |
| 200 dwellings at 90 m² each (major development) | 18,000 m² | £787,680 | £393,840 | £393,840 |
All examples assume 100% residential with no communal-area adjustments. Real schemes will differ based on communal floorspace, PBSA bedspaces, and exemptions.
The 50% brownfield discount
For a typical 50-dwelling scheme in Reigate and Banstead, successfully evidencing previously developed land status saves £109,400 in levy. That’s the whole point of the PDL evidence workflow — the statutory definition (any building on the site since 1 July 1948, excluding agriculture) is broader than the local brownfield register, and most sites qualify in full or in part when historic OS maps and aerial imagery are reviewed.
Related authorities
Similar rates or alphabetically adjacent:
Submitting your BSL information to Reigate and Banstead
BSL submissions happen in two stages: (1) at your building-control application, and (2) at your first commencement notice. Reigate and Banstead has five weeks from your commencement notice to assess and issue a liability notice. Any GIA or PDL discrepancy can delay commencement.
BSL Prep extracts chargeable GIA from your architectural PDFs, compiles the PDL evidence pack, and produces the submission proforma for Reigate and Banstead in one click. See pricing →