Building Safety Levy in Tandridge

Tandridge is the 56th most expensive of 298 English collecting authorities. The greenfield area rate is £44.00/m², halved to £22.00/m² where ≥75% of the red-line boundary qualifies as previously developed land. BSL commences 1 October 2026 and is collected by Tandridge at building-control and commencement stages.

Rates for Tandridge

Rate type£ per m² GIAApplies when
Greenfield (standard)£44.00Less than 75% of site is previously developed land
Brownfield (PDL discount)£22.00≥75% of site is previously developed land (any building since July 1948, excluding agriculture)

Source: Schedule 3, Building Safety Levy (England) Regulations 2025, effective 1 October 2026.

Example scheme costs in Tandridge

SchemeTotal chargeable GIA Greenfield levyBrownfield levyPDL saving
10 dwellings at 85 m² each (small infill)850 m²£37,400£18,700£18,700
50 dwellings at 100 m² each (typical phase)5,000 m²£220,000£110,000£110,000
100 dwellings at 95 m² each (mid-size scheme)9,500 m²£418,000£209,000£209,000
200 dwellings at 90 m² each (major development)18,000 m²£792,000£396,000£396,000

All examples assume 100% residential with no communal-area adjustments. Real schemes will differ based on communal floorspace, PBSA bedspaces, and exemptions.

The 50% brownfield discount

For a typical 50-dwelling scheme in Tandridge, successfully evidencing previously developed land status saves £110,000 in levy. That’s the whole point of the PDL evidence workflow — the statutory definition (any building on the site since 1 July 1948, excluding agriculture) is broader than the local brownfield register, and most sites qualify in full or in part when historic OS maps and aerial imagery are reviewed.

Run your scheme through the calculator →

Related authorities

Similar rates or alphabetically adjacent:

Enfield £44.13Reading £43.77Reigate and Banstead £43.76Stevenage £43.46Tameside £23.80Tamworth £23.84Teignbridge £29.78Telford and Wrekin £24.37

Submitting your BSL information to Tandridge

BSL submissions happen in two stages: (1) at your building-control application, and (2) at your first commencement notice. Tandridge has five weeks from your commencement notice to assess and issue a liability notice. Any GIA or PDL discrepancy can delay commencement.

BSL Prep extracts chargeable GIA from your architectural PDFs, compiles the PDL evidence pack, and produces the submission proforma for Tandridge in one click. See pricing →